• Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten
  • Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten

Scheduling of Resource-Constrained Projects

Robert Klein
Hardcover | Engels | Operations Research/Computer Science Interfaces | nr. 10
€ 335,95
+ 671 punten
Uitvoering
Levering 2 à 3 weken
Eenvoudig bestellen
Veilig betalen
Gratis thuislevering vanaf € 30 (via bpost)
Gratis levering in je Standaard Boekhandel

Omschrijving

Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practitioners as well as scientists working in the field of project management.
The book is divided into two parts. In Part I, the project management process is described and the management tasks to be accomplished during project planning and control are discussed. This allows for identifying the major scheduling problems arising in the planning process, among which the resource-constrained project scheduling problem is the most important. Part II deals with efficient computer-based procedures for the resource-constrained project scheduling problem and its generalized version. Since both problems are NP-hard, the development of such procedures which yield satisfactory solutions in a reasonable amount of computation time is very challenging, and a number of new and very promising approaches are introduced. This includes heuristic procedures based on priority rules and tabu search as well as lower bound methods and branch and bound procedures which can be applied for computing optimal solutions.

Specificaties

Betrokkenen

Auteur(s):
Uitgeverij:

Inhoud

Aantal bladzijden:
369
Taal:
Engels
Reeks:
Reeksnummer:
nr. 10

Eigenschappen

Productcode (EAN):
9780792386377
Verschijningsdatum:
30/11/1999
Uitvoering:
Hardcover
Bestandsformaat:
Genaaid
Afmetingen:
156 mm x 234 mm
Gewicht:
716 g
Standaard Boekhandel

Alleen bij Standaard Boekhandel

+ 671 punten op je klantenkaart van Standaard Boekhandel
MUST-HAVES

Hier bloeit iets

Nu dubbele punten op onze selectie nieuwe titels
MUST-HAVES
Hier bloeit iets
AANGERADEN

Onze cadeautips

voor Vaderdag
AANGERADEN
Onze cadeautips voor Vaderdag
VADERDAG ACTIE

Alleen in onze winkels: kortingsbon van € 10 voor e-books

bij een Vivlio e-reader
VADERDAG ACTIE
Vivlio e-reader + € 10 aan e-books
Standaard Boekhandel

Beoordelingen

We publiceren alleen reviews die voldoen aan de voorwaarden voor reviews. Bekijk onze voorwaarden voor reviews.